136-150 of 160
  • Bürkert Fluid Control Systems: Flow control valves for CO2 delivery in water treatment
    Flow control valves for CO2 delivery in water treatment
    Bürkert Fluid Control Systems
    Project, 02 July 2020
    Project
    SAVE Project
  • Bürkert Fluid Control Systems: Flow control valves for CO2 delivery in water treatment
    Flow control valves for CO2 delivery in water treatment
    Bürkert Fluid Control Systems
    Delivering high quality water supplies to remote communities can be a considerable challenge for water authorities, but a combination of expert engineering skills and innovative process control equipment has delivered a solution.
    SAVE Project
  • Temporary multistage water treatment for reservoir
    Siltbuster
    Siltbuster installed a temporary multistage water treatment solution as part of a project to drain down Llanishen Reservoir, Cardiff to test the existing scour valves. The reservoir is being drained down at a flow rate of circa...
    SAVE Project
  • Chemical dosing equipment for wind turbine farm
    Siltbuster
    The largest onshore wind farm in England and Wales was being constructed on top of the Rhigos Mountain. Large excavations intended for wind turbine bases rapidly filled with clay-rich water preventing the pouring of concrete and...
    SAVE Project
  • Water treatment plants for Wimbleball Dam repairs
    Siltbuster
    Wimbleball Dam near Dulverton in Somerset is a 50m-high concrete diamond headed buttress, approximately 300m long and 50m high. Due to leakages, re-grouting works were required in order to repair the dam. Siltbuster installed two...
    SAVE Project
  • Decommissioning of Battersea Power Station
    Siltbuster
    A large area of hard-standing was being used as a holding area for stockpiles of potentially contaminated soil excavated from the Battersea Power Station site. The volume of water runoff from the stockpiles was significant during...
    SAVE Project
  • Pre-chemical treatment system for Usk pumping station
    Siltbuster
    Siltbuster provided Skanska with a 3-stage pre-chemical treatment system within a small compound for a new pumping station in South Wales. Surface water run-off from the site and ground water ingress had collected in an...
    SAVE Project
  • Conical treatment tanks for mixing of algae and effluent
    Enduramaxx
    I-Phyc’s phosphorus processing plant at Broadwindsor STW uses a chemical-free algal treatment to remove phosphorus, ammonia and other contaminants from tertiary water while locking away carbon and creating sustainable products.
    SAVE Project
  • Temporary water treatment solution - Wentwood Reservoir
    Siltbuster
    Wentwood Reservoir in South Wales has a Victorian control tower with 18th century valves which needed to be removed and replaced, bringing it up to current working standards. 250,000m3 of water needed to be drained from the...
    SAVE Project
  • DAF improves removal of contaminants at gasworks
    Siltbuster
    A Siltbuster D20 DAF unit was supplied to Costain, who had been subcontracted to install drainage throughout the Nine Elms gaswork redevelopment site on the South Bank London, which is being cleared as part of the plan to deliver...
    SAVE Project
  • Odour control covers for picket fence thickener tanks
    Corporate Engineering
    At Thames Water's Long Reach sewage treatment works in Dartford, odour control covers were required to 2 picket fence thickeners. It was necessary to ensure regular access all around the perimeter of the tank to clean and inspect...
    SAVE Project
  • Sanitary sewer overflows for Cog Moors WwTW
    Trojan Technologies
    Discharge from the Cog Moors WwTW is near three bathing water beaches. Due to the growing popularity of these beaches the Environment Agency Wales introduced stringent stormwater spill limits of three per bathing season along...
    SAVE Project
  • Refurbishment of screens for Southern Water
    Jacopa
    Southern Water needed screening equipment to be serviced as part of their scheduled 5-year and 10-year refurbishment specifications. Precise requirements to be quoted on were sent to Jacopa and other companies through the main...
    SAVE Project
  • Removal of metaldehyde for Anglian Water
    Trojan Technologies
    Anglian Water decided to install a TrojanUVTorrent™ECT UV-oxidation system as part of a multi-barrier approach to ensure it produced a potable water supply that matched the high standards required by regulators and customers
    SAVE Project
  • Tank covers for 1.4km long channel, Beckton STW
    Corporate Engineering
    Beckton sewage treatment works was first established in 1864 and is the largest in Europe. The site features a 1.4km long channel that measures 600mm wide and increases as more tanks discharge into it, up to a width of 12m. The...
    SAVE Project
  • Gas detection for gas pipe networks
    International Gas Detectors
    Many flammable gas hazards are present when fuel gas, typically LPG is bulk stored for distribution across a site. Such off grid applications are very common and many clients come to IGD for gas detection solutions to enhance...
    SAVE Project