Projects and case studies from reedbed and wetland specialists on Enviropro. Inspiration and ideas to help you find the best solution for your project.
1-14 of 14
  • ARM Ltd: Aerated vertical flow wetland for CSO effluent
    Aerated vertical flow wetland for CSO effluent
    ARM Ltd
    A major Scottish Water infrastructure development was undertaken in Cowdenbeath including the construction of two new Combined Sewer Overflows (CSOs) which collected additional surface water from within the town. Wastewater...
  • ARM Ltd: Airport run-off treatment, Mayfield Farm Treatment Works
    Airport run-off treatment, Mayfield Farm Treatment Works
    ARM Ltd
    Mayfield Farm Treatment Works, commissioned in 2001, was designed to treat run-off from Heathrow Airport’s Southern Catchment. The run-off is contaminated with glycols resulting from the airport's de-icing operations.
  • ARM Ltd: Aerated saturated vertical flow reedbed for Welsh Water
    Aerated saturated vertical flow reedbed for Welsh Water
    ARM Ltd
    Kingstone and Madley Waste Water Treatment Works, operated by Welsh Water, was constructed in the late 1940's and has been modified on several occasions over the years to accommodate the increasing population in the area.
  • ARM Ltd: Aerated saturated vertical flow: secondary sewage
    Aerated saturated vertical flow: secondary sewage
    ARM Ltd
    The wastewater treatment works at Balhall is operated by Scottish Water and serves a small hamlet and farm in Angus near Brechin. The site originally comprised a septic tank, which discharged into a local stream.
  • ARM Ltd: Vertical flow reedbed: municipal effluent
    Vertical flow reedbed: municipal effluent
    ARM Ltd
    Lower Basildon WwTW is owned and operated by Thames Water and is situated within the grounds of Beale Park seven miles North West of Reading. The works serves a PE 166 (2011 – Average). Sewage is collected by gravity and...
  • ARM Ltd: Aerated reedbed treatment meets tight targets for school
    Aerated reedbed treatment meets tight targets for school
    ARM Ltd
    A preparatory school in Oxfordshire upgraded its sewage treatment system to a constructed wetland fitted with Forced Bed Aeration™, which works within the existing footprint, is environmentally-friendly and meets its...
  • ARM Ltd: Surface water run-off solution for distribution centre
    Surface water run-off solution for distribution centre
    ARM Ltd
    IKEA's Peterborough warehouse generates a significant rainfall catchment. The consequent run-off generated during rainfall events required management and treatment prior to discharge back into the environment. A spillway was...
  • ARM Ltd: Aerated saturated vertical flow reedbed - outdoor centre
    Aerated saturated vertical flow reedbed - outdoor centre
    ARM Ltd
    ARM Ltd made used of existing treatment assets at The Raymond Priestley Centre outdoor activity centre in the Lake District National Park and enhanced them with a Forced Bed Aerated™ vertical downflow reedbed situated...
  • ARM Ltd: Aerated saturated vertical flow reedbed for Thames Water
    Aerated saturated vertical flow reedbed for Thames Water
    ARM Ltd
    Uffington Waste Water Treatment Works serves a population of 700-800 in a rural situation and comprised a primary settlement tank, filter bed and humus tank. Due to its age and an increasing load from the village the works...
  • ARM Ltd: Vertical flow reedbed treats sewage at Conway Centre
    Vertical flow reedbed treats sewage at Conway Centre
    ARM Ltd
    In 2009 ARM, along with subcontractors Eco-tech Systems, installed a vertical flow reedbed at the Conway Centre on Anglesea. The system was designed to treat sewage from the Education Centre. More than 21,000 children and...
  • ARM Ltd: Vertical flow reedbeds for Anglian Water
    Vertical flow reedbeds for Anglian Water
    ARM Ltd
    Anglian Water required a tertiary treatment solution for their site at Earls Colne in Essex. The discharge consents for the site were to be tightened by the Environment Agency. The site had no power available and the cost of...
  • ARM Ltd: Landfill leachate treatment, Bobbingworth
    Landfill leachate treatment, Bobbingworth
    ARM Ltd
    Veolia Environmental Services operate Bobbingworth landfill site in Essex. Following the capping and landscaping of the site, Veolia required a means of treating leachate, which was accumulating within the landfill and being...
  • ARM Ltd: Vertical reed bed system for municipal sewage treatment
    Vertical reed bed system for municipal sewage treatment
    ARM Ltd
    Hulland Ward Waste Water Treatment Works is owned and operated by Severn Trent Water, serving a population of approximately 900 people. The system was originally constructed in the 1960s comprising a conventional biological...
  • ARM Ltd: Ferric sludge reed bed treatment trial results
    Ferric sludge reed bed treatment trial results
    ARM Ltd
    The asset management strategy for Essex and Suffolk Water identified a need for a new process for sludge handling at Hanningfield Water Treatment Works (WTW). Supplied with raw water from Hanningfield Reservoir (354 Ha),...