1-7 of 7

ELIQUO HYDROK

   St Columb, TR9 6TL   View on map
Call 01726 862000   Visit website
  • ELIQUO HYDROK: Mecana pile cloth media filters for phosphorus removal
    Mecana pile cloth media filters for phosphorus removal
    ELIQUO HYDROK
    ELIQUO HYDROK worked with main contractor, Mott MacDonald Bentley, and Severn Trent Water to provide Mecana pile cloth media filtration systems for low effluent phosphorus removal at 11 sites throughout the UK. The pile...
  • ELIQUO HYDROK: Flow control for Louth flood alleviation
    Flow control for Louth flood alleviation
    ELIQUO HYDROK
    Consultants Atkins conducted a feasibility study into the viability of a flood defence scheme for the River Lud at Louth. Two online flood storage areas were identified and the volume of storage would be dependent on the...
  • ELIQUO HYDROK: IFAS & FBDA for Northumbrian Water
    IFAS & FBDA for Northumbrian Water
    ELIQUO HYDROK
    Seaton Carew STW needed a substantial upgrade to provide extra treatment capacity to accommodate recent and predicted growth within the catchment. In April 2016, Hydrok installed a combination of the Integrated Fixed-Film...
  • ELIQUO HYDROK: Raw water intake screening for SES Water, Croydon
    Raw water intake screening for SES Water, Croydon
    ELIQUO HYDROK
    ELIQUO HYDROK designed, manufactured and installed a simple but effective raw water intake screening system for SES Water at Goatbridge, Croydon. The design and engineering team’s approach was to create bespoke 2mm wedge...
  • ELIQUO HYDROK: PCMF tertiary filtration installed at Rayleigh
    PCMF tertiary filtration installed at Rayleigh
    ELIQUO HYDROK
    Rayleigh East WRc is a trickling filter works with a large expanse of grass plots to retain the solids discharged from nitrifying trickling filters, prior to UV disinfection. Anglian Water approached ELIQUO HYDROK to deliver...
  • ELIQUO HYDROK: 'Flushing bell' installation for United Utilities
    'Flushing bell' installation for United Utilities
    ELIQUO HYDROK
    ELIQUO HYDROK completed the installation of a 3m diameter x 3.5m high CWF Storm Flush 'flushing bell' storm tank cleaning system as part of United Utilities' Salford 172 Project (Buffalo Court). The Salford 172 project...
  • ELIQUO HYDROK: Combined sewer overflow for United Utilities at Hyndburn
    Combined sewer overflow for United Utilities at Hyndburn
    ELIQUO HYDROK
    United Utilities needed a refurbishment solution for their combined sewer overflow system in the Hyndburn drainage area, East Lancashire. The CSO chamber is 18 metres below ground within an 84m-long tunnel. ELIQUO HYDROK...