George Fisher offer complete solutions and leading-edge plastic piping systems for critical cooling systems in Data Centres.
Owners and operators of Data Centres can rely on our innovation in piping systems and the expertise of our 15,800 employees based in more than 30 countries worldwide.
GF's piping systems help to reduce energy costs on average by 25 percent compared to traditional metal systems. The inherent lower thermal conductivity of plastic, together with pre-insulation from the factory means the system is highly energy efficient and robust.
The systems are maintenance-free for at least 25 years, vapour-tight and resistant to weather and UV. This reduces the maintenance requirements and running costs of the cooling system for reliable operation.
With comprehensive project support, pre-insulated components and off-site prefabrication we can significantly reduce the time from design to the commissioning of a new data centre.
Energy Efficiency & Sustainabilty
We can help you achieve the carbon neutral data centre of the future. Plastic pipe systems have a minimum life-span 25 years, with no corrosion or encrustation of internal pipe bores.
Pre-Fabrication
GF Piping Systems' global network of workshops can create be-spoke or multiple off-site fabricated spools and modules and pump stations, either to customer wishes or using in-house GF Piping Systems engineers.
Engineering
GF Piping Systens has its own in-house engineering staff with years of experience in plastic pipe systems design and installation. We can help re-engineer your metallic systems to plastic
Systems & Solutions
GF Piping Systems has been at the forefront of innovation in plastic pipe systems since more than 50 years, with a clear focussed strategy on the development of application orientated solutions.
George Fisher offer complete solutions and leading-edge plastic piping systems for critical cooling systems in Data Centres.
Owners and operators of Data Centres can rely on our innovation in piping systems and the expertise of our 15,800 employees based in more than 30 countries worldwide.
GF's piping systems help to reduce energy costs on average by 25 percent compared to traditional metal systems. The inherent lower thermal conductivity of plastic, together with pre-insulation from the factory means the system is highly energy efficient and robust.
The systems are maintenance-free for at least 25 years, vapour-tight and resistant to weather and UV. This reduces the maintenance requirements and running costs of the cooling system for reliable operation.
With comprehensive project support, pre-insulated components and off-site prefabrication we can significantly reduce the time from design to the commissioning of a new data centre.
Energy Efficiency & Sustainabilty
We can help you achieve the carbon neutral data centre of the future. Plastic pipe systems have a minimum life-span 25 years, with no corrosion or encrustation of internal pipe bores.
Pre-Fabrication
GF Piping Systems' global network of workshops can create be-spoke or multiple off-site fabricated spools and modules and pump stations, either to customer wishes or using in-house GF Piping Systems engineers.
Engineering
GF Piping Systens has its own in-house engineering staff with years of experience in plastic pipe systems design and installation. We can help re-engineer your metallic systems to plastic
Systems & Solutions
GF Piping Systems has been at the forefront of innovation in plastic pipe systems since more than 50 years, with a clear focussed strategy on the development of application orientated solutions.