A 30k Muffin Monster was used at an apartment complex in Villa Mountain Vista North, Las Vegas, to get rid of clogging in their onsite lift station.
The challenge
There were frequent pump malfunctions due to lots of unexpected items - objects such as wipes, clothing, toothbrushes and toys - reaching the pumps
Unclogging was labour-intensive, time-consuming and expensive
Unclogging required training and certification
The project
A 30K Muffin Monster was installed (with Wipes ready technology)
By using a right-angled gear reducer, the overall height of the grinder was brought down to be a perfect fit for the tightly designed pump station
"The cost savings for my customer speak for themselves: In a 90-day period, approximately 20,000 USD was saved."
Colin Pirrie, Plumbing Enterprises representative and onsite treatment manager
The solution
We delivered a 30K Muffin Monster to protect the lift station pumps
Easy to install
Fits in small spaces
Wipes Ready technology helps shred all tough solids into small pieces
A 30k Muffin Monster was used at an apartment complex in Villa Mountain Vista North, Las Vegas, to get rid of clogging in their onsite lift station.
The challenge
There were frequent pump malfunctions due to lots of unexpected items - objects such as wipes, clothing, toothbrushes and toys - reaching the pumps
Unclogging was labour-intensive, time-consuming and expensive
Unclogging required training and certification
The project
A 30K Muffin Monster was installed (with Wipes ready technology)
By using a right-angled gear reducer, the overall height of the grinder was brought down to be a perfect fit for the tightly designed pump station
"The cost savings for my customer speak for themselves: In a 90-day period, approximately 20,000 USD was saved."
Colin Pirrie, Plumbing Enterprises representative and onsite treatment manager
The solution
We delivered a 30K Muffin Monster to protect the lift station pumps
Easy to install
Fits in small spaces
Wipes Ready technology helps shred all tough solids into small pieces