ELOVAC® is a compact, ready-to-connect vacuum degassing system for digested sludge, with an option for integrated phosphate precipitation. Designed to reduce methane emissions and improve dewatering in anaerobic digestion plants, it helps lower polymer use, minimises phosphate backwater, and prevents struvite scaling. Skid-mounted for flexible installation in buildings or containers.

  • Vacuum degassing system for digested sludge with optional phosphate precipitation

  • Captures methane for use as biogas, reducing carbon footprint

  • Improves dewatering and reduces polymer consumption

  • Prevents struvite scaling in pipes and equipment

  • Enhances biosolids quality for agricultural use

  • Supplied as a compact, skid-mounted unit for easy installation

  • Scalable to suit different plant sizes and requirements

Applications

  • Anaerobic digestion plants seeking to reduce environmental impact and improve sludge management

Dimensions

ELOVAC model

footprint

treatment capacity

treatment plant size

10

1.8m x 5.2m

2-10m3/h

<150,000 PE

20

1.8m 5.5m

5-20m3/h

<400,000 PE

30

2.5m x 6.5m

10-30m3/h

<600,000 PE

40

2.5m x 7.3m

15-40m3/h

<750,000 PE

Installation

Supplied as a skid-mounted system for flexible placement in buildings or containers

Manufacture

Made in Germany

Sustainability

Reduces methane emissions and disposal costs, improves carbon footprint