Coveya Easikit 600 conveyor for Thames Tideway project

Coveya Easikit 600 conveyor for Thames Tideway project

Coveya supplied and installed a temporary conveyor solution at the Thames Tideway sewer tunnel project. The conveyor was needed to move backfill material from the delivery area along the river path to the newly constructed cofferdam in the river – a distance of approximately 80m
Coveya
  • PROJECT